1,861
edits
(add notes) |
(add speed tests) |
||
Line 36: | Line 36: | ||
Across the street: Verizon LTE eNB 16687 | Across the street: Verizon LTE eNB 16687 | ||
== Speed tests == | |||
All at close range, Google Fi, March 2023 after T-Mobile upgrade: | |||
{| class="wikitable sortable" | |||
! Device !! Connection !! Latency (ms) !! Download (Mbps) !! Upload (Mbps) !! Link | |||
|- | |||
| Galaxy S22 || NR NSA || 59 || 585.5 || 96.6 || https://www.speedtest.net/my-result/a/9171129258 | |||
|- | |||
| Galaxy S22 || NR NSA || 74 || 561.9 || 111.6 || https://www.speedtest.net/my-result/a/9171139564 | |||
|- | |||
| Galaxy S22 || NR SA || 76 || 523.2 || 13.4 || https://www.speedtest.net/my-result/a/9171134412 | |||
|- | |||
| Galaxy S22 || NR SA || 75 || 517.9 || 10.2 || https://www.speedtest.net/my-result/a/9171135634 | |||
|} | |||
NR SA: N41+N25+N41 (100+20+40MHz). | |||
== Permits/registration == | == Permits/registration == | ||
Line 51: | Line 69: | ||
March 8, 2023: Bell tower is open for upgrade. | March 8, 2023: Bell tower is open for upgrade. | ||
March 25, 2023: Bell tower has been open for weeks. Today it is closed on one side and open on the other. (I didn't see the third side.) | March 25, 2023: Bell tower has been open for weeks. Today it is closed on one side and open on the other. (I didn't see the third side.) Broadcasting 5G NR for first time. | ||
March 30, 2023: Bell tower closed. | |||
[[Category:T-Mobile in El Paso County Colorado]] | [[Category:T-Mobile in El Paso County Colorado]] |
edits