3,659
edits
Line 1: | Line 1: | ||
o2 2G/3G/4G/5G site at Kaiser-Wilhelm-Straße 129 in Berlin-Lankwitz close to the Teltow Kanal separating Lankwitz from Steglitz. Following [262 3 20334|eNB ID 20334]], in December 2020 this site was reconstructed as one of the two first 5G-Massive-MiMo sites in Lankwitz. | o2 2G/3G/4G/5G site at Kaiser-Wilhelm-Straße 129 in Berlin-Lankwitz close to the Teltow Kanal separating Lankwitz from Steglitz. Following [[262 3 20334|eNB ID 20334]], in December 2020 this site was reconstructed as one of the two first 5G-Massive-MiMo sites in Lankwitz. | ||
Seen from the west. Comparison before vs. after the reconstruction: | Seen from the west. Comparison before vs. after the reconstruction: |
edits