2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used. | 2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used. | ||
2022-04-27: new STOB (064636) with TEF n78 | |||
2022-04-29: DT n78 AAUs mounted, cables running down into noisy cabinet, but LTE/NR still not live | 2022-04-29: DT n78 AAUs mounted, cables running down into noisy cabinet, but LTE/NR still not live | ||
[[File:262_1_tbd_262_3_42407_A.jpg|400px]] | [[File:262_1_tbd_262_3_42407_A.jpg|400px]] |