Difference between revisions of "234 30 20516"

Jump to navigation Jump to search
27 bytes removed ,  15:41, 11 July 2022
no edit summary
Line 2: Line 2:
'''Operator''' | ''EE''<br>
'''Operator''' | ''EE''<br>
'''Vendor''' | ''Nokia''<br>
'''Vendor''' | ''Nokia''<br>
'''Bands''' | ''Band 3 + 20''<br>
'''Bands''' | ''Band 3 (x2) + 20''<br>
'''Mast Type''' | ''Monopole / Phase 5''<br>
'''Mast Type''' | ''Monopole / Phase 5''<br>
<br>
<br>
Line 9: Line 9:
'''17th May 2016'''<br>''Phase 5 monopole installed. 4G Added.''<br>
'''17th May 2016'''<br>''Phase 5 monopole installed. 4G Added.''<br>
'''28th March 2021'''<br>''Phase 8 monopole installed.''<br>
'''28th March 2021'''<br>''Phase 8 monopole installed.''<br>
'''1st April 2021'''<br>''Phase 8 brought online.<br>-- Still B1 and B20 only. Bigger rollout/upgrade on Three UK (See eNB 6573)''<br>
'''1st April 2021'''<br>''Phase 8 brought online. Still B1 and B20 only.<br>-- Bigger rollout/upgrade on Three UK. See eNB 6573.''<br>
'''9th July 2022'''<br>''Secondary B3 carrier added (EARFCN 1761/10mhz). Backhaul upgrade still required.''<br>
'''9th July 2022'''<br>''Secondary B3 carrier added. 10Mhz / EARFCN 1761.''<br>
<br>
<br>
<u>'''Notes'''</u><br>
<u>'''Notes'''</u><br>
158

edits

Navigation menu