Difference between revisions of "234 30 20516"

309 bytes added ,  15:38, 11 July 2022
no edit summary
Line 8: Line 8:
'''17th May 2016'''<br>''Phase 4 monopole removed''<br>
'''17th May 2016'''<br>''Phase 4 monopole removed''<br>
'''17th May 2016'''<br>''Phase 5 monopole installed. 4G Added.''<br>
'''17th May 2016'''<br>''Phase 5 monopole installed. 4G Added.''<br>
'''28th March 2021'''<br>''Phase 8 monopole installed.''<br>
'''1st April 2021'''<br>''Phase 8 brought online.<br>-- Still B1 and B20 only. Bigger rollout/upgrade on Three UK (See eNB 6573)''<br>
'''9th July 2022'''<br>''Secondary B3 carrier added (EARFCN 1761/10mhz). Backhaul upgrade still required.''<br>
<br>
<br>
<u>'''Notes'''</u><br>
<u>'''Notes'''</u><br>
'''1''' | Backhaul is 195Meg BT Wholesale (MEAS).<br>
'''1''' | Backhaul is 195Meg BT Wholesale (MEAS).<br>
<br>
<br>
''Information correct as of 15th Mar 2021''</span>
''Information correct as of 11th July 2022''</span>
158

edits