Difference between revisions of "262 3 42407"

99 bytes added ,  16:11, 6 May 2022
no edit summary
(Created page with "2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used. 400px")
 
Line 1: Line 1:
2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used.
2022-03-13: DT preparation ongoing, antennas mounted (lower level), but cables not connected to base station yet. 4x2 ports used.
2022-04-29: DT n78 AAUs mounted, cables running down into noisy cabinet, but LTE/NR still not live


[[File:262_1_tbd_262_3_42407_A.jpg|400px]]
[[File:262_1_tbd_262_3_42407_A.jpg|400px]]
408

edits